F FISP Hub

Staten Island · Local Law 11 / FISP · Cycle 10

Check any Staten Island building's facade inspection status.

Search a Staten Island address against DOB's live FISP filing records, see how the borough's buildings are doing in Cycle 10, and find out which filing deadline applies to yours.

Run by a NY-licensed QEWI Sourced from NYC DOB Open Data No account or building ownership required

Check your building's FISP status

CYCLE 10 · LIVE SNAPSHOT
Try or

Citywide Cycle 10 filings on record with DOB NOW: Safety, deduplicated to one record per building, queried live from NYC Open Data on every page load.

Staten Island · FISP / Local Law 11

Facade inspections in Staten Island: where things stand

Staten Island has only around 140 buildings in the FISP program, so owners and boards here are less likely to have neighbors who've been through the process recently. The rules, deadlines, and penalties are exactly the same as in Manhattan.

Loading live Staten Island Cycle 10 numbers from DOB…

Cycle 10 so far

As of October 7, 2026, 20 Staten Island buildings have a Cycle 10 facade report on file with DOB, out of roughly 137 that filed in Cycle 9. Of the 26 Cycle 10 filings so far, 6 (23%) report Unsafe conditions, 7 (27%) were filed as SWARMP, and 13 (50%) as Safe.

Cycle 10 is still early. The 10A and 10B filing windows are open and 10C hasn't started, and buildings that file first aren't a random sample, so these percentages will move. The live line above updates every time the page loads.

How Staten Island did in Cycle 9

Cycle 9 resultFilingsShare
Unsafe2411%
SWARMP (safe with repair program)8338%
No report filed3918%
All Cycle 9 filings218100%

The SWARMP number matters most for Cycle 10. A condition reported as SWARMP in Cycle 9 can't be reported as SWARMP again. If it wasn't repaired and turns up as Unsafe this cycle, the owner faces a $2,000 penalty on top of the usual Unsafe penalties. See the full penalty schedule.

Streets with the most FISP buildings

By number of buildings that filed in Cycle 9: Park Hill Avenue (9), Victory Boulevard (7), Brabant Street (7), Henderson Avenue (6), Richmond Terrace (5). Two buildings on the same block can still fall in different sub-cycles, because the deadline depends on each building's tax block number, not its street.

Which deadline applies to your Staten Island building

  • Tax block ending in 4, 5, 6 or 9: sub-cycle 10A, window closes February 21, 2027. 10A details
  • Ending in 0, 7 or 8: sub-cycle 10B, closes February 21, 2028. 10B details
  • Ending in 1, 2 or 3: sub-cycle 10C, opens February 21, 2027. 10C details

Not sure of the block number? Enter the address in the lookup above. Borough is already set to Staten Island.

How the deadlines work

Cycle 10 runs 2025–2029, in three staggered waves

Every building's filing window is fixed by the last digit of its tax block number — not by borough, not by owner, not by building size. Two buildings across the street from each other can be in different sub-cycles.

SUB-CYCLE

10A
Feb 21, 2025 – Feb 21, 2027
Block number ends in
4569

SUB-CYCLE

10B
Feb 21, 2026 – Feb 21, 2028
Block number ends in
078

SUB-CYCLE

10C
Feb 21, 2027 – Feb 21, 2029
Block number ends in
123

Don't know your block number? It's on your property tax bill, or look up your address in DOB NOW: Safety. If you'd rather not dig for it, use the check above — we'll pull it as part of a free review.

Reading your result

What the four filing statuses actually mean

Unsafe

The facade has a condition that could pose a risk to public safety — a protective sidewalk shed is usually required. Repairs and a corrective filing must follow, and penalties accrue monthly until DOB accepts an amended report closing it out.

SWARMP

Safe With A Repair and Maintenance Program. The facade passed with conditions — the QEWI identified items that need ongoing monitoring or scheduled repair. Compliant for now, but the maintenance plan has to actually be followed and eventually closed out.

Safe

Filed, inspected, and accepted with no outstanding conditions. Nothing further required until the next cycle.

Filed · pending review

A report has been submitted for this cycle but DOB hasn't finished processing it. Not the same as no filing at all — check back, or ask your QEWI of record for the status.

What it costs to wait

The fines outlast the inspection

DOB penalties for FISP don't stop on their own — they keep accruing every month until the correct report is filed or the condition is fixed.

Late or missing filing

$1,000/mo

For every month a report is filed after the deadline. If no report is filed at all, add $5,000 per year after the filing window closes.

Failure to correct an Unsafe condition

$1,000/mo

Starting in year two, add $10 per linear foot of sidewalk shed per month, rising to $40 per foot by year five — until the condition is corrected.

Who's behind this

An actual inspector, not just a database

QEWI
ON
RECORD

FISP Hub is maintained by AMA Architects, P.C., a New York-licensed, DOB-registered Qualified Exterior Wall Inspector firm. Every status explanation on this site reflects the same standards the firm applies on its own Cycle 10 filings.

NY-LicensedDOB-RegisteredQEWI Firm

Next step

Get a free compliance review

Tell us about your building or portfolio and we'll confirm what DOB actually has on file, what's due, and what it would take to close any gaps — no obligation.

By submitting, you agree to be contacted by AMA Architects, P.C. about your facade compliance.

Common questions

FAQ