F FISP Hub

NYC Local Law 11 / FISP · Cycle 10

Find out where your building stands on facade compliance — before DOB tells you the hard way.

Every building over six stories in New York City has to file a facade inspection report on a fixed schedule. Miss it, and the fines start at $5,000 and keep compounding monthly. FISP Hub checks your address against the city's own filing records in seconds, explains exactly what your status means, and connects you to a licensed inspector if you need one.

Run by a NY-licensed QEWI Sourced from NYC DOB Open Data No account or building ownership required

Check your building's FISP status

CYCLE 10 · LIVE SNAPSHOT
Try or

Citywide Cycle 10 filings on record with DOB NOW: Safety, deduplicated to one record per building, queried live from NYC Open Data on every page load.

How the deadlines work

Cycle 10 runs 2025–2029, in three staggered waves

Every building's filing window is fixed by the last digit of its tax block number — not by borough, not by owner, not by building size. Two buildings across the street from each other can be in different sub-cycles.

SUB-CYCLE

10A
Feb 21, 2025 – Feb 21, 2027
Block number ends in
4569

SUB-CYCLE

10B
Feb 21, 2026 – Feb 21, 2028
Block number ends in
078

SUB-CYCLE

10C
Feb 21, 2027 – Feb 21, 2029
Block number ends in
123

Don't know your block number? It's on your property tax bill, or look up your address in DOB NOW: Safety. If you'd rather not dig for it, use the check above — we'll pull it as part of a free review.

Reading your result

What the four filing statuses actually mean

Unsafe

The facade has a condition that could pose a risk to public safety — a protective sidewalk shed is usually required. Repairs and a corrective filing must follow, and penalties accrue monthly until DOB accepts an amended report closing it out.

SWARMP

Safe With A Repair and Maintenance Program. The facade passed with conditions — the QEWI identified items that need ongoing monitoring or scheduled repair. Compliant for now, but the maintenance plan has to actually be followed and eventually closed out.

Safe

Filed, inspected, and accepted with no outstanding conditions. Nothing further required until the next cycle.

Filed · pending review

A report has been submitted for this cycle but DOB hasn't finished processing it. Not the same as no filing at all — check back, or ask your QEWI of record for the status.

What it costs to wait

The fines outlast the inspection

DOB penalties for FISP don't stop accruing on their own — they compound every month until the correct paperwork is filed.

Failure to file a report

$5,000

Initial penalty, plus $1,000 every additional month the filing stays outstanding.

Failure to correct an Unsafe condition

$1,000/mo

Plus $10 per linear foot of affected facade (or $1,000 per balcony, whichever is higher) — recurring until an amended report is accepted.

Who's behind this

An actual inspector, not just a database

QEWI
ON
RECORD

FISP Hub is maintained by Amath Tidiane Ba, Principal of AMA Architects, P.C. — a New York-licensed, DOB-registered Qualified Exterior Wall Inspector firm. Every status explanation on this site reflects the same standards AMA applies when it files a Cycle 10 report of its own.

RAAIANCARB RROQEWILEED AP BD+CCEM

Next step

Get a free compliance review

Tell us about your building or portfolio and we'll confirm what DOB actually has on file, what's due, and what it would take to close any gaps — no obligation.

By submitting, you agree to be contacted by AMA Architects, P.C. about your facade compliance.

Common questions

FAQ